Sunday 15 February 2015



Here you see 4 trains, 2 can run at the same time and 2 can stop at siding. 2 fast trains and 2 slow trains running from level 1 to level 2.  A maximum of 12 ft can be fitted onto the siding. At the back is level 3 where you can see train nr 5.


You can see a train going downhill towards the bridge and one is going up in the other direction at the far end.  At the back you can see a bit of the train at level 3.

I have now completed soldering wires all around the track direct from the controller this helps heavy trains to climb the steep incline.  It now works well even without weights.



Here you can see 4 trains photographed from the other end.  At the back in the distance is another train. 


No comments:

Post a Comment