Wednesday 16 July 2014


Incline number 2 is S shaped


More detail of 2 levels with S shaped going up and the other going down.



This part is level one slowly rising to level two.  The back part is meeting up with the bridge  joining the harbour further back.  In the foreground there is space for a double lifting track to allow access to the centre of the layout.



This is the area where the track at the back is going down very gently to a lower level.